PM Surya Ghar Subsidy 2026: Should You Choose a Hybrid or On-Grid Inverter?
Quick answer: Both hybrid and on-grid inverters can qualify for the PM Surya Ghar subsidy. The central subsidy is up to ₹78,000 for a home system of 3 kW or more, and it is calculated on your solar panel capacity, not on the type of inverter. Choose on-grid for the lowest cost on a reliable grid. Choose hybrid if you face regular power cuts.
Since the scheme launched in February 2024, crores of Indian households have registered for rooftop solar. The question we hear most often from homeowners, dealers and installers is simple: which inverter should I buy? As a solar inverter manufacturer in India that builds both hybrid and on-grid inverters, we see the confusion every day. This guide explains how the subsidy works, how the two inverter types differ, and how to pick the right one for your home.
Key takeaways
- The central subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, capped at ₹78,000.
- MNRE has confirmed that rooftop systems with hybrid inverters and battery storage are eligible.
- The subsidy amount is the same for hybrid and on-grid systems; the battery cost is yours.
- Panels must be made in India (DCR), and your inverter must meet BIS and grid-safety standards.
- On-grid suits reliable cities; hybrid suits areas with frequent power cuts.
What Is the PM Surya Ghar Subsidy?
PM Surya Ghar: Muft Bijli Yojana was launched on 15 February 2024 with an outlay of ₹75,021 crore. Its goal is to put rooftop solar on 1 crore homes by March 2027 and give each household up to 300 units of free electricity a month. The PM Surya Ghar subsidy is paid as Central Financial Assistance (CFA) directly into the homeowner’s bank account after the system is installed and inspected.
Rooftop solar size | Typical monthly use | Central subsidy |
|---|---|---|
1 kW | 0–150 units | ₹30,000 |
2 kW | 150–300 units | ₹60,000 |
3 kW and above | 300+ units | ₹78,000 (maximum) |
To qualify, you need to be an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken any other solar subsidy. Several states, including Uttar Pradesh, add their own top-up on top of the central amount, so check with your DISCOM. You apply through the official PM Surya Ghar national portal.
Does a Hybrid Inverter Qualify for the PM Surya Ghar Subsidy?
Yes. In September 2024, the Ministry of New and Renewable Energy clarified that residential rooftop systems with battery storage are eligible for CFA, and that hybrid inverters can be installed as per your state electricity regulator’s rules. The same clarification asked DISCOMs to allow inverters up to your sanctioned connected load, even if you start with fewer panels. That means you can install a larger inverter today and add panels later without replacing it.
Two points matter for your budget:
- The PM Surya Ghar subsidy amount does not change with the inverter type. It is based on the kW of solar panels you install, so a 3 kW hybrid system and a 3 kW on-grid system both receive ₹78,000.
- The battery is not separately subsidised. If you choose a hybrid inverter, the battery cost comes out of your pocket, which is why a hybrid system costs more upfront.
Hybrid vs On-Grid Inverter: The Key Differences
Feature | On-grid inverter | Hybrid inverter |
|---|---|---|
Power during a power cut | No, it shuts down for safety | Yes, runs from battery and solar |
Battery | Not used | Lithium or tubular battery |
Net metering | Yes | Yes |
Upfront cost | Lowest | Higher (inverter + battery) |
Maintenance | Very low | Low with lithium; water top-up with tubular |
Best for | Reliable city grids, lowest bill | Frequent outages, critical loads |
Eligible for PM Surya Ghar subsidy | Yes | Yes |
An on-grid inverter converts solar DC power to AC and sends any surplus to the grid through a net meter. It switches off during a power cut because of anti-islanding protection, which keeps linemen safe while they repair the grid.
A hybrid inverter does everything an on-grid inverter does, and also charges a battery. When the grid fails, it keeps your fans, lights, fridge and Wi-Fi running from the battery and solar panels.
Which Inverter Should You Choose?
Choose on-grid if your grid is reliable
If you live in a metro or a city with fewer than one or two short cuts a month, an on-grid solar inverter gives the fastest payback. You get the full PM Surya Ghar subsidy, net metering credits and the lowest system cost.
Choose hybrid if you face regular power cuts
In many Tier-2 and Tier-3 towns and rural areas, daily cuts are still common. A hybrid solar inverter protects you from outages, replaces your old home UPS and still earns net metering credits. Look for one that works with lithium as well as tubular batteries so you are not locked into one battery brand.
Planning a battery or EV later?
If you are not ready for a battery today, you can still plan ahead. MNRE allows inverters up to your sanctioned load, so you can choose an inverter size that leaves room for more panels. If backup is likely in the next few years, buy a hybrid inverter now and add the battery when your budget allows.
How Much Can You Save? A 3 kW Example
A 3 kW rooftop system in most of India generates about 12–15 units a day, or roughly 360–450 units a month, depending on location and shading.
Item | Example |
|---|---|
System price (panels + inverter + installation) | [Your quote] |
Less: PM Surya Ghar subsidy | – ₹78,000 |
Less: state top-up (if any) | – [State amount] |
Your net cost | Quote – subsidies |
Monthly savings at ₹7 per unit × 400 units | about ₹2,800 |
Yearly savings | about ₹33,600 |
For a hybrid system, add the battery cost to the system price. The savings stay similar, but you also gain backup during outages, which many families value as much as the lower bill.
Rules Your Panels and Inverter Must Meet
The subsidy is only paid if your system follows MNRE rules. Before you sign with a vendor, check these points:
- Made-in-India panels (DCR): Panels must meet the Domestic Content Requirement, and there is no DCR relaxation for PM Surya Ghar. From 1 June 2026, ALMM List-II also brings Indian-made solar cells into the rules for many projects.
- BIS-registered inverter: Grid-connected inverters must meet Indian safety and grid standards, including anti-islanding protection under IS 16169.
- Registered vendor: Your installer must be registered on the national portal and empanelled with your DISCOM.
- Correct inverter size: The inverter can be up to your sanctioned connected load.
- Net meter and inspection: Your DISCOM installs the net meter and inspects the system before releasing the subsidy.
Missing any one of these can delay or block your PM Surya Ghar subsidy, so ask your vendor for certificates in writing.
How to Apply for the PM Surya Ghar Subsidy in 6 Steps
- Register on the national portal with your state, DISCOM, electricity consumer number, mobile number and email.
- Apply for rooftop solar and wait for feasibility approval from your DISCOM.
- Choose a registered vendor and get the system installed.
- Submit plant details on the portal and apply for net metering.
- DISCOM inspection: after the net meter is installed and the system is inspected, a commissioning certificate is generated on the portal.
- Submit bank details and a cancelled cheque; the subsidy is credited to your account.
How to Choose the Right Solar Inverter Manufacturer
The inverter is the brain of your solar system and the part most likely to need service, so the brand behind it matters. When comparing options, look for a solar inverter manufacturer that offers:
- Clear certifications: BIS registration and ISO 9001:2015 quality management.
- Battery flexibility: a hybrid inverter that works with lithium and tubular batteries.
- Published specifications: efficiency, PV input, MPPT range and IP rating listed on the website.
- Real warranty and service: a written warranty and a service team you can actually call.
- Its own factory: a manufacturer, not a trader, so you get factory support and spare parts.
Fortuner Inverters for PM Surya Ghar Homes
Fortuner, made by Protonix Fortuner India Pvt Ltd, designs and builds solar inverters at its plants in Noida and Modinagar. For homes applying under the scheme, we offer:
- H-Shakti hybrid solar inverters with built-in MPPT, Wi-Fi monitoring and support for lithium or tubular batteries.
- On-grid solar inverters from 1 kW to 20 kW for net metering.
- E-Shakti inverters with an inbuilt lithium battery for compact backup in flats and shops.
Browse the full product range or download our catalogue. Not sure which inverter size you need for the PM Surya Ghar subsidy? Contact our team with your monthly bill and backup needs, and our engineers will recommend the right system.
Frequently Asked Questions
Can I get the PM Surya Ghar subsidy with a hybrid inverter? Yes. MNRE has confirmed that rooftop systems with battery storage and hybrid inverters are eligible, as long as the system meets DCR, BIS and net metering rules.
Is the battery covered by the subsidy? No. The subsidy is based on the kW of solar panels installed. The battery is an extra cost you pay yourself.
Does an on-grid inverter work during a power cut? No. On-grid inverters shut down during a grid failure for safety. You need a hybrid inverter with a battery for backup.
What size inverter do I need for a 3 kW system? A 3 kW inverter matches a 3 kW system. MNRE also allows an inverter up to your sanctioned load, so you can choose a larger one if you plan to add panels later.
When will I receive the subsidy? After your DISCOM inspects the system and installs the net meter, you submit your bank details on the portal and the amount is credited to your account.
Final Word
The PM Surya Ghar subsidy makes rooftop solar affordable for millions of Indian homes, and it supports both inverter types. If your grid is reliable, an on-grid inverter delivers the lowest cost. If power cuts are part of daily life, a hybrid inverter gives you savings and backup in one box. Whichever you choose, buy from a certified manufacturer and follow the MNRE rules so your subsidy arrives without delay.
Ready to go solar? Talk to Fortuner for a free system recommendation.